nf1nk
Aug 10 2007, 03:53 PM
I a starting my steam punk Short. So using a Top down methodology I am starting with the control panel, working out to the wheel house then to the boiler and engine room, and then throwing a skin on the whole thing.
Here is the gauge panel. the colors are place holders at this point.
nf1nk
Aug 10 2007, 04:08 PM
From another angle
nf1nk
Aug 14 2007, 12:06 PM
One step at a time, progress is slow
arkaos
Aug 14 2007, 01:30 PM
How's he going to be able to read the gauges with all those levers in the way?
nf1nk
Aug 14 2007, 04:14 PM
Good thought.
maybe I will need to move the compass down and put the gauges above them on a shelf
I think a redesign is in order.
This is a "lo-fi" version of our main content. To view the full version with more information, formatting and images, please
click here.