picking up on the last tutarials i done. i have come across a problem with my A:M on my computer.
when i follow the project pathease on my machine. as i go to set the pathease to 100% for the first action, it delets the action.
i draw the path.
i drag and drop the knight.
i constrane him to the path.
i drag and drop on him the walk action
i drag and drop on him the wave action
i drag the walk action on the time line to last to 3 second
i drag the wave action to start at the 3 second point
i go to frame 3:00 (3 seconds) in the time (frame) box
i open up the path propertys and set the pathease
i type in 100
press the enter key and the walk action disapears from the timeline.
the action is still listed but the line i exstended in the timeline has gone.
if i run the frame the knight just stays at the end of the path and waves a the three second point.
any ideas?????????????
attached is the two projects knight2 is before the pathease is set and knight3 is the sane project saved after i set the pathease.